Connected up house

On the first phase of the construction and it includes:

  • Bearing external walls inlaid (plated) with 22 mm OSB
  • Inwalls
  • Braced griders plates inlaid with 22 mm OSB
  • The framework with the renetment, prepared for the coating

Comments are closed.